This project case covers the installation of a rail mounted gantry crane for shield tunneling and metro tunnel construction in Saint Petersburg, Russia. From the project background and lifting requirements to the site conditions, the case records how the equipment solution was developed around the actual construction environment.

Our engineering team visited the site to assess the working area and installation conditions before the crane was confirmed. The case then follows the equipment installation, on-site technical guidance, commissioning, operator training, and final handover, showing how the rail mounted gantry crane was installed and put into operation at the tunnel construction site.

Contexto do projeto

The project is located in Saint Petersburg, Russia, where a metro tunnel is being constructed using shield tunneling. Heavy materials, tunnel construction components, and equipment need to be lifted and moved within the designated work area. The site required a rail mounted gantry crane that could operate along a fixed rail system and support regular lifting work in the tunnel construction process.

The main challenges were:

  1. Heavy-load lifting: Handle the required lifting loads during tunnel construction.
  2. Fixed-route travel: Move loads along the designated rail path with controlled positioning.
  3. Limited construction space: Adapt the crane to the available site layout and working conditions.
  4. Installation requirements: Complete crane assembly and installation accurately at the project site.
  5. Operator operation: Provide practical training so the local team could operate the crane after commissioning.

The required result was a rail-mounted gantry crane that could be installed, commissioned, and put into operation on site, with onsite engineering support covering installation guidance and operator training.

Rail Mounted Gantry Crane for Shield Tunneling in Saint Petersburg

Onsite Site Survey and Rail Mounted Gantry Crane Selection

Before confirming the equipment configuration, our engineering team visited the Saint Petersburg project site to assess the actual working conditions. The survey focused on the rail layout, available installation space, lifting positions, load requirements, crane travel route, and surrounding construction conditions. The site assessment formed the basis for the final rail-mounted gantry crane configuration.

Based on the site conditions and shield tunneling requirements, the selection focused on:

  1. Lifting capacity — matched to the maximum load handled during tunnel construction.
  2. Crane span and rail gauge — designed around the available working area and existing rail layout.
  3. Lifting height — selected according to the required clearance and load positioning height.
  4. Rail-guided travel — suited to the fixed movement route required at the construction site.
  5. Crane dimensions — controlled according to the available installation and operating space.
  6. Control and safety systems — selected according to the operating method and actual site conditions.
  7. Installation requirements — considered in advance to simplify on-site assembly, commissioning, and handover.

The final solution was based on the actual site conditions rather than a standard crane configuration.

Project Equipment and Technical Specifications

For the Saint Petersburg shield tunneling project, the rail mounted gantry crane was configured around the actual lifting requirements and tunnel construction conditions.

Project Configuration

  • Crane Type: Rail Mounted Gantry Crane
  • Lifting Capacity: 60+60 t
  • Lifting Height: 65 m
  • Lifting System: Heavy-duty hoisting system designed for the project load requirements
  • Trolley System: Rail-mounted trolley for horizontal load movement across the crane span
  • Crane Travel System: Rail-guided travel along the designated construction route
  • Supporting Structure: Gantry frame configured for the required span, rail gauge, lifting height, and site clearance
  • Control System: Crane control system configured for lifting, trolley travel, and crane travel operations
  • Power Supply: Configured according to the available site power conditions
  • Safety Configuration: Selected according to lifting loads, travel conditions, operating space, and tunnel construction requirements
  • Application: Shield tunneling and metro tunnel construction
  • Project Status: Installed, commissioned, and put into operation

Our engineers can conduct an on-site survey to assess the tunnel dimensions, rail layout, lifting loads, working radius, installation space, operating frequency, and surrounding conditions, then provide a project-specific crane configuration and technical recommendation.

Obtenha uma Cotação Personalizada Agora

Rail Mounted Gantry Crane for Shield Tunneling in Saint Petersburg

The above configuration reflects this Saint Petersburg project. Crane capacity, lifting height, span, rail gauge, trolley speed, crane travel speed, power supply, control mode, and safety devices can be customized for different working conditions. 

Why a Rail Mounted Gantry Crane Was Selected for the Metro Tunnel Project

The Saint Petersburg project involves shield tunneling for metro construction. Heavy materials and tunnel components need regular lifting and movement. A rail mounted gantry crane was selected for the fixed rail layout and heavy-load lifting requirements.

Rail-Guided Crane Travel

The crane runs on fixed rails.
The travel path follows the site layout.
Loads can be moved between designated positions.

Heavy Load Handling

The project requires heavy-load lifting.
The crane has a 60+60 t lifting capacity.
It is used for materials, tunnel components, and construction equipment.

Controlled Lifting

The crane handles lifting and load positioning within the work area.
Hoisting, trolley travel, and crane travel follow the site operating plan.

Adaptation to Shield Tunneling

The crane was configured for the tunnel construction site.
The design considers the rail layout, lifting requirements, available space, and working conditions.

Onsite Installation by Our Engineering Team

The rail mounted gantry crane was delivered to the Saint Petersburg metro tunnel project after production and inspection. Our engineering team went to the site for installation support and operator training.

Crane Installation at the Saint Petersburg Site

The installation covered the main crane structure, legs, hoisting system, trolley, electrical system, and rail connection. The team checked the crane structure, rail alignment, electrical connections, and key components during installation.

The crane was assembled and installed according to the site conditions and project requirements. Installation checks were completed before commissioning.

Installation Guidance

Our engineers were present at the project site and provided face-to-face guidance throughout the installation. The local team received direct instruction on assembly, component connection, adjustment, and installation checks.

Operator Training

After crane installation and commissioning, our engineers provided face-to-face operator training at the Saint Petersburg site. The training covered basic crane operation, hoisting, trolley travel, crane travel, load positioning, and daily operating checks. Operators practiced the controls on the installed rail mounted gantry crane under the guidance of our engineers before the equipment entered regular service.

This on-site support gave the project team direct access to the engineers responsible for the equipment installation. The same engineering team continued with commissioning and operator training after installation.

Rail Mounted Gantry Crane Put Into Operation

After installation, commissioning, and operator training, the rail mounted gantry crane was put into operation at the Saint Petersburg metro tunnel construction site.

The crane now serves the lifting and material handling work required for shield tunneling. It travels along the fixed rail system and moves loads between designated working positions.

The trained operators can control the hoisting, trolley travel, and crane travel according to the site operating procedures. The completed installation and commissioning marked the start of regular crane operation at the project site.

Rail Mounted Gantry Crane Application in Shield Tunneling

In this Saint Petersburg project, the rail mounted gantry crane is used at the metro tunnel construction site for heavy-load lifting and material handling. The crane travels along the fixed rail system and serves designated lifting areas around the shield tunneling operation.

Application ScenarioDescrição
Metro Tunnel ConstructionLifting and moving materials within the construction area.
Shield TunnelingHandling loads around the shield machine and tunnel work area.
Tunnel Construction Material HandlingTransporting construction materials between designated positions.
Heavy Equipment LiftingLifting heavy equipment and components as required.
Tunnel Component HandlingMoving tunnel segments and related components during construction.
Construction Site LiftingSupporting routine lifting operations along a fixed rail route.

The actual crane application depends on the project layout, load requirements, rail arrangement, and construction process. The equipment can be configured for different shield tunneling and underground construction conditions.

Why Choose WEIHUA Rail Mounted Gantry Crane for Tunnel Construction?

WEIHUA provides rail-mounted gantry cranes for heavy lifting and material handling in industrial and construction projects. Each crane is configured according to the project requirements, site layout, and operating conditions.

  • Rail Mounted Gantry Crane Manufacturing — In-house crane manufacturing for project-specific requirements.
  • Custom Lifting Capacity and Span — Lifting capacity, span, lifting height, and rail gauge can be configured for the site.
  • Engineering Support — Engineers can assess project conditions and provide equipment recommendations.
  • Onsite Installation Guidance — Engineers can visit the project site and guide crane installation.
  • Commissioning Support — Crane inspection and commissioning are carried out before operation.
  • Operator Training — Face-to-face training is available for local crane operators.
  • International Project Experience — WEIHUA equipment has been supplied for overseas industrial and construction projects.
  • After-Sales Service — Technical support is available after the crane is put into operation.

For your tunnel construction project, contact WEIHUA to discuss the lifting capacity, span, rail layout, and working conditions for a suitable rail-mounted gantry crane.

Ela
15+ Anos de experiência.
10,000+ Clientes
150+ Países

Ela

Engenheiro Mecânico de Guindastes

“Com mais de 10 anos de experiência técnica no Grupo Weihua, ofereço soluções de elevação confiáveis e inteligentes, personalizadas para atender às suas necessidades industriais globais.”

  • Consulta: Configurações específicas do local e seleção de capacidade.
  • Projetos: Soluções para pórticos, pontes rolantes portuárias, marítimas e de circulação aérea.
  • Apoiar: Manutenção do ciclo de vida e otimização técnica.